No SIRS may be completed after December 31, 2026. An eight-step checklist for Florida condo tower Boards that have not finished their Structural Integrity Reserve Study.
Related Posts
If your condominium tower still does not have a completed Structural Integrity Reserve Study, the calendar is no longer on your side. Florida required most unit-owner-controlled associations that existed on or before July 1, 2022 to finish their first SIRS by December 31, 2025. The law allows one narrow exception: an association whose milestone inspection is due on or before December 31, 2026 may complete the SIRS at the same time as that inspection. Either way, the statute is blunt. In no event may the study be completed after December 31, 2026.
Missing that date is not a paperwork problem. Here is what Florida law says it can cost:
- Board liability. If officers or directors willfully and knowingly fail to complete a SIRS, the statute treats that failure as a breach of their fiduciary relationship to the unit owners.
- State penalties. The Division of Florida Condominiums, Timeshares, and Mobile Homes has jurisdiction over the procedural completion of structural integrity reserve studies. It may impose civil penalties against an association, which can be imposed for each day a violation continues but may not exceed $5,000 for any offense, and it may penalize, remove or bar an individual officer or director who willfully and knowingly violates the condominium act.
- Sales, lending and insurance fallout. Every owner selling a unit must give the buyer the association’s most recent SIRS, or a statement that the association has not completed one, and for contracts signed after December 31, 2024 the buyer can cancel within 7 days of receiving those documents. A building without a study is harder to sell and harder to explain to the lenders and insurers who price its risk.
What follows is the checklist we would want every coastal tower Board to work through before the year ends. It is general information about Florida’s requirements, not legal advice. Your association’s attorney should confirm how each rule applies to your building.
The checklist
- ☐1. Confirm the building is in scope. The SIRS requirement applies to each building on residential condominium property that is three habitable stories or higher. It does not apply to single-family through four-family dwellings with three or fewer habitable stories. There is no coastal distance test in the SIRS law: a tower on the Gulf and a tower inland are covered the same way. Proximity to salt water matters for the milestone inspection instead, where the local building official may require the first inspection at 25 years rather than 30. Once the first study is done, a new one is required at least every 10 years.
- ☐2. Engage a qualified professional. The study must be performed by a Florida-licensed engineer or architect, or by a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts. It must cover the roof, the structure including load-bearing walls and primary structural members, fireproofing and fire protection systems, plumbing, electrical systems, waterproofing and exterior painting, and windows and exterior doors. Get a signed engagement with a committed completion date, not a spot on a waiting list.
- ☐3. Put a reserve funding plan in place. The study must include a reserve funding plan or schedule with a recommended annual reserve amount. For budgets adopted on or after December 31, 2024, owners of a unit-owner-controlled association that must have a SIRS may not vote to provide no reserves, or less than the required reserves, for the items the study covers. The law does allow such an association to use a line of credit or loan to fund capital expenses required by a milestone inspection. Plan the funding before the study lands, so the numbers do not arrive as a surprise.
- ☐4. Review insurance with your agent. The study states the remaining useful life and replacement cost of your building’s major components. Share it with your insurance agent ahead of renewal so valuations and coverage reflect the building as it really is, and so any open repair items are discussed before an underwriter raises them.
- ☐5. Send the owner communication. Within 45 days after receiving the study, the association must either distribute a copy to each unit owner or deliver notice that it is available for inspection and copying on written request. In the same 45 days, the association must file a statement with the Division confirming the study was completed and made available to owners. Associations with 25 or more units must also post the most recent SIRS on the association’s website or app.
- ☐6. Organize the records. Structural integrity reserve studies are official records and must be kept for at least 15 years after completion. Keep the study, the milestone inspection report and its summary, and your funding decisions together and easy to produce, because sellers will need them for buyers and owners will ask for them.
- ☐7. Review turnover implications. If the developer still controls the association, the developer must have a turnover inspection report for each building three stories or higher before turning over control, and that report includes a structural integrity reserve study of the same major components. The developer must also deliver the association’s most recent SIRS at turnover. If your Board took control recently, confirm you actually received both.
- ☐8. Build the post-study action plan. Carry the recommended reserve amounts into the next budget, schedule the repairs and replacements the study identifies, and set a date for the next study within 10 years. If a milestone inspection has identified required repairs, the law allows an association to delay a required SIRS for no more than the two consecutive budget years immediately following that inspection so it can focus its money on those repairs. Ask counsel whether that applies before relying on it.
Do this week if you are starting late
- Find out which deadline is yours. Pull your milestone inspection records, the building’s age and height, and any prior reserve study, and ask your association attorney to confirm in writing whether your outside date is already behind you or is December 31, 2026.
- Request proposals from qualified professionals. Contact at least two firms that meet the statute’s qualifications and ask each for a firm completion date, a scope that covers every required component, and their current availability.
- Put it on the agenda. Notice a Board meeting to approve the engagement, the funding approach and the owner communication plan, so nothing waits on a vote once the proposals are in.
Frequently asked questions
Tampa condo boards can see how PBM keeps these deadlines on track on our Tampa condo association management page.
Is the SIRS deadline December 31, 2025 or December 31, 2026?
For most unit-owner-controlled associations that existed on or before July 1, 2022, the deadline was December 31, 2025. An association whose milestone inspection is due on or before December 31, 2026 may complete the SIRS at the same time as that inspection, but the statute says the study may not be completed after December 31, 2026 in any event. Your association attorney should confirm which date applies to your building.
Does our building need a SIRS if it is not on the coast?
Yes, if it is a residential condominium building three habitable stories or higher. The SIRS law has no coastal distance test. Proximity to salt water affects the milestone inspection, where the local building official may require the first inspection at 25 years instead of 30.
Who is allowed to perform a SIRS?
A Florida-licensed engineer or architect, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts.
Can owners vote to waive reserves for the items in the study?
Not for budgets adopted on or after December 31, 2024. Owners of a unit-owner-controlled association that must have a SIRS may not vote to provide no reserves, or less than the required reserves, for the items the study covers. The law does allow a line of credit or loan to fund capital expenses required by a milestone inspection.
What happens if our Board misses the deadline?
A willful and knowing failure by officers or directors to complete the study is treated as a breach of their fiduciary duty to the unit owners. The Division can also impose civil penalties on the association, up to $5,000 for any offense, and can penalize or remove individual officers and directors who willfully and knowingly violate the condominium act.
Need help getting it done?
Professional Bayway Management has been in business for 42 years and today serves more than 135 associations and 10,235 units. If your Board needs help getting its study across the line, request a proposal. We respond to proposal requests within 1 business day.
Or call (727) 866-3115.
Related reading
For the full picture of how milestone inspections and structural integrity reserve studies fit together, read our Florida Milestone Inspections and SIRS Guide.
PBM in Your Inbox
Subscribe to get notifications to your email when we publish new content like articles or videos or webinars to the PBM website.