About this Post
Structural Integrity Reserve Studies explained: which buildings need one, what it must cover, and why reserves can no longer be waived.
Related Posts
The Structural Integrity Reserve Study, or SIRS, is the single biggest budget change Florida condominium associations have faced in a generation. Here is what boards need to understand.
Which buildings need a SIRS
Condominium and cooperative associations with buildings of three or more habitable stories are required to have a Structural Integrity Reserve Study. It must be updated at least every 10 years.
What the study must cover
A SIRS examines the major structural and life-safety components of the building, including:
- Roof
- Structure, including load-bearing walls and other primary structural members and systems
- Fireproofing and fire protection systems
- Plumbing
- Electrical systems
- Waterproofing and exterior painting
- Windows and exterior doors
- Any other item with a deferred maintenance or replacement cost exceeding $25,675 (the 2026 threshold, indexed for inflation) that would negatively affect the above if not maintained
The part that changes everything
Reserves for the components identified in the SIRS must be funded. Boards can no longer vote to waive them or fund them below the required level, as many associations routinely did for years.
For a community that deferred reserves for a decade, this is not a paperwork exercise. It is a significant, and sometimes painful, adjustment to the annual budget. Boards that plan for it deliberately fare far better than boards that get surprised by it.
What a board should do now
- Confirm whether your building has three or more habitable stories, and therefore is in scope.
- Get the SIRS done by a qualified provider if you have not already.
- Model the funding requirement against your current budget honestly, before it becomes a special assessment conversation.
- Communicate early with owners. Assessment increases are far better received when the board explains the legal requirement and the plan.
A management company that knows this landscape can help your board plan the funding path rather than react to it.
Clearwater boards can see how PBM coordinates structural integrity reserve work on our Clearwater condo management page.
Or call (727) 866-3115.
PBM in Your Inbox
Subscribe to get notifications to your email when we publish new content like articles or videos or webinars to the PBM website.